Ringkasan Biaya Instalasi Sterilisasi / CSSD
Unit: Instalasi Sterilisasi / CSSD Unit Penunjang (Pendukung)
| No | Nama Biaya | Nilai (Rp) |
|---|---|---|
| 1 | Biaya Air | 1.708.270 |
| 2 | Biaya Penyusutan Aset | 0 |
| 3 | Biaya Penyusutan Alat Utama | 0 |
| 4 | Biaya ATK/ART | 52.751.352 |
| 5 | Biaya Lain-lain | 1.616.076 |
| 6 | Biaya BMHP | 0 |
| 7 | Biaya Listrik | 2.906.905 |
| 8 | Biaya Penyusutan Gedung | 4.353.967 |
| 9 | Total Biaya Pemeliharaan | 1.744.783 |
| 10 | Total Gaji | 229.171.800 |
| 11 | Biaya Telepon | 2.277.694 |
| 12 | Alokasi Reciprocal (Biaya Pendukung) | 66.099.787 |
| TOTAL AKHIR | Rp 362.630.634 | |